Electrical Engineering
Jam Foods Facility, San Rafael CA
The Challenge – Convert an existing storage building into a food production facility utilizing existing utility capacities Project Goals Design electrical systems to support the
Google, Palo Alto – Commissioning
The Challenge – Increase the main electrical service without interruption to regular business operation, and complete it on schedule on budget, and in compliance with
Kaiser Ontario, Sustainable Microgrid Hospital
CONTECH-CA Role: Electrical Engineer – Microgrid Consulting Project Description: The project, which includes 2.2 megawatts (MW) of solar, a 1 MW fuel cell from Bloom
San Benito Health Foundation – Hollister, CA
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is a small (17,584 square foot) critical health care facility serving
580 Irwin St, Office Re-Development San Rafael, CA
CONTECH-CA Role: Electrical Engineer of Record Project Description: Remodel of existing office and warehouse to accommodate the new tenant, Russell Hinton Co. Painting and Drywall Contractor Design
UC Davis Medical Center Surgery and Emergency Pavilion, Sacramento, CA
Role: Electrical Engineer and Project Manager Project Description The project opened in 2011—comprised of a 4-story, 471,000-sq-ft surgery and emergency pavilion The new building
Bond Lane Tiburon, CA – Electrical Distribution, Utility & Coordination
Role: We collaborated with the site owner to develop load calculations necessary for the PG&E application and service sizing. Project description: Consultation and assistance in the
Laguna Honda Hospital, San Francisco, CA Redevelopment
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.* My involvement started at Schematic Design and I led the
Remote critical infrastructure emergency power technical support – Multinational locations
Roll: Provided technical support troubleshooting and design assistance for critical infrastructure systems located in various remote locations around the world. Project description: The project replaced
John Muir Health, Walnut Creek, CA – Generator Replacement
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Led project from concept and budgeting through construction and commissioning. Oversaw the design,
MarinHealth, Greenbrae, CA – Nurse Call System Upgrade Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Project Description: Upgrade of the existing analog nurse call system. The upgrade was
Residence, Goodhill Rd, Kentfield, CA – Electrical Distribution, Utility & Tesla Coordination
Role: We collaborated with the site owner to develop cost-effective electrical distribution solutions, Extensive Coordination with Tesla to ensure the power walls were completely integrated. Project
MarinHealth, Greenbrae, CA – Generator Controls Replacement Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. As a project was undertaken as an OSHPD emergency project we also led
Residence, Laurel Grove, Kentfield, CA – Electrical Distribution & Utility Coordination
Role: We collaborated with the site owner to develop cost-effective electrical distribution solutions. Project description: Consultation and assistance in the preparation of technical information required for
2000 Marin St Redevelopment, San Francisco, CA, Redevelopment Masterplan
Collaborated with site owner to develop electrical distribution solutions.
New Stanford Hospital, Palo Alto, CA
Role: As the electrical engineer (EEOR) for the new Stanford Hospital, instrumental in the design and construction of the normal and emergency power systems.*During the
Ford Research and Innovation Center, Palo Alto
Project Description: Assisted in the design of the electrical systems for this unique project in the heart of Silicon Valley for Ford.* As a longtime
MarinHealth Oak Pavillion Hospital, Greenbrae, CA
Role: As the electrical engineer (EEOR) for the new MarinHealth Hospital, led the design of the normal and emergency power systems.*During the design worked closely
Pond Farm Brewing Co., San Rafael CA
Project description: Electrical engineering service for Pond Farm Brewing Co. Project Type Building Conversion Features Micro Brewery, Dining Area & Bar Sustainability Adaptive re-use, low
Kaiser Permanente, San Leandro, CA
Delivered on a Budget and Two Months Ahead of Schedule. Principal in Charge for the MEP Design (John Was employed by Mazzetti while working on
Jam Foods Facility, San Rafael CA
The Challenge – Convert an existing storage building into a food production facility utilizing existing
Google, Palo Alto – Commissioning
The Challenge – Increase the main electrical service without interruption to regular business operation, and
Kaiser Ontario, Sustainable Microgrid Hospital
CONTECH-CA Role: Electrical Engineer – Microgrid Consulting Project Description: The project, which includes 2.2 megawatts
San Benito Health Foundation – Hollister, CA
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is
580 Irwin St, Office Re-Development San Rafael, CA
CONTECH-CA Role: Electrical Engineer of Record Project Description: Remodel of existing office and warehouse to accommodate
UC Davis Medical Center Surgery and Emergency Pavilion, Sacramento, CA
Role: Electrical Engineer and Project Manager Project Description The project opened in 2011—comprised of
Bond Lane Tiburon, CA – Electrical Distribution, Utility & Coordination
Role: We collaborated with the site owner to develop load calculations necessary for the PG&E application
Laguna Honda Hospital, San Francisco, CA Redevelopment
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.*
Remote critical infrastructure emergency power technical support – Multinational locations
Roll: Provided technical support troubleshooting and design assistance for critical infrastructure systems located in various
John Muir Health, Walnut Creek, CA – Generator Replacement
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Led project from
MarinHealth, Greenbrae, CA – Nurse Call System Upgrade Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Project Description: Upgrade
Residence, Goodhill Rd, Kentfield, CA – Electrical Distribution, Utility & Tesla Coordination
Role: We collaborated with the site owner to develop cost-effective electrical distribution solutions, Extensive Coordination with
MarinHealth, Greenbrae, CA – Generator Controls Replacement Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. As a project
Residence, Laurel Grove, Kentfield, CA – Electrical Distribution & Utility Coordination
Role: We collaborated with the site owner to develop cost-effective electrical distribution solutions. Project description: Consultation
2000 Marin St Redevelopment, San Francisco, CA, Redevelopment Masterplan
Collaborated with site owner to develop electrical distribution solutions.
New Stanford Hospital, Palo Alto, CA
Role: As the electrical engineer (EEOR) for the new Stanford Hospital, instrumental in the design
Ford Research and Innovation Center, Palo Alto
Project Description: Assisted in the design of the electrical systems for this unique project in
MarinHealth Oak Pavillion Hospital, Greenbrae, CA
Role: As the electrical engineer (EEOR) for the new MarinHealth Hospital, led the design of
Pond Farm Brewing Co., San Rafael CA
Project description: Electrical engineering service for Pond Farm Brewing Co. Project Type Building Conversion Features
Kaiser Permanente, San Leandro, CA
Delivered on a Budget and Two Months Ahead of Schedule. Principal in Charge for the